Clients




The Plant is equipped with an Automated Motoman Welding Cell. The Plant also consists of a completely automated positioner to accommodate any type of special welding for manufacturing various components.

   Hydraulic Presses From 40 to 500 Tons

   Power Press From 20 to 250 Tons

AUTOMATIC ROBOT WELDING PLANT PAINT SHOP & POWDER COATING FACILITY
WELDING FACILITY SHEARING SHEDS
TOOL ROOM OTHER GENERAL MACHINES

AUTOMATIC ROBOT WELDING PLANT

  • Robot Welding Plant - Motoman SK6 Plant
  • Positioners for Mounting Fixtures
  • Programmable Software
  • Flexible Infrastructure to do any component assembly/welding
  • High Speed Welding                 &nb >Back to Top

PAINT SHOP & POWDER COATING FACILTY

  • Tank Pretreatment Plant
  • Conveyor Type
  • Semi Automated Paint Facility
  • Liquid &Electro Static Paint Facility
  • Baking Units
  • Powder Coating Facility                                                                             Back to Top

WELDING FACILITY

  • Seam Welding
  • Spot Welding
  • Projecion Welding
  • Mig/Mag Welding
  • Robot Welding
  • Arc Welding                                                      h 8mm thickness
  • Semi Automatic Decoiling & Sliting machines
  • Laser Cutting*                                                                                         Back to Top

TOOL ROOM

  • Design Capability
  • Surface Grinder
  • Milling Machine
  • Shaper
  • Jig Boring*
  • Wire Cutting*
  • Spark Erosion*
  • Cylindrical Grinder*                                                                                 Back to Top
OTHER GENERAL MACHINES
  • Lathes
  • Drilling Machines
  • Grinding Stations
  • Band Saw
  • Plate Bending Machines
  • Tube Bending Machines
  • Deburring Stations
  • SPM's                                                                                                      Back to Top

 

 

News of SVC GROUP

Robot Welding

SVC introducees Robot welding in its Autocomponents manufacturing facility. The first of the kind in the region.

 

Quality Landmark

TS16949 Certification Audit has been completed successfully is 03/2003. ISO14000 expected by 10/2003 and ISO18000 OSHAS by 11/2003

© The SVC Group   |   Privacy Policy  |   Terms of Use